Sales hotline020-39218003 haidefanglei@126.com 中文


Pre-discharge lightning rod

Pre-discharge lightning rod The pre-discharge lightning rod will will lead to a pilot, rapidly propagating in the direction of lightning until it captures lightning and directs it

Lightning Rods (Direct Strike)Category
35 mm DIN railMounting
On requestDatasheet
5 yearsWarranty

Pre-discharge lightning rod The pre-discharge lightning rod will will lead to a pilot, rapidly propagating in the direction of lightning until it captures lightning and directs it into the earth.The laboratory confirmed that this start-up time, which is earlier than the normal needle, is called △T. It provides a lightning protection function that is more effective to pre-discharge lightning rod. It is beautiful in shape, simple in structure, and easy to install. It conforms to NFC17-102 and UNE. -21186 standard, stainless steel material, corrosion resistance, light weight, easy installation. Model Description HD-AIF25 Imax:200kA, △T=25us, L=330mm, 3KG, have own patent HD-AIF40 Imax:250kA, △T=40us, L=330mm, 3KG, have own patent HD-AIF60 Imax:300kA, △T=60us, L=330mm, 3KG, have own patent Installation suggestion: 1.Determine the type of building lightning protection according to the area, height of the protected building, the average number of days of thunderstorms in the location, the correction coefficient of the geographical environment, and the nature of the use of the building. 2.From the lightning protection category and the area of the building, determine the protection radius and determine whether to use one or more "Haide" pre-discharge lightning rod. 3.The down conductor shall be electrically connected with the main reinforcement of the building,two or more down conductors shall be made according to the regulations, and an lightning counter may be installed optionally. 4.The down lead should be used to make disconnected cards and protect the nearby ground.

Enquiry

Send an inquiry

Your message goes straight to our WeCom (Enterprise WeChat). Reply within one working day. · Pre-discharge lightning rod

To speed up our reply, please include the single-line diagram or equipment list, the installation point (main board / sub-board / equipment), the supply or signal system, and the project location.

Your message is delivered to our WeCom. Reply within one working day.
WeChat service QRScan to contact service